Extreme Makeover

Extreme Makeover

In today’s edition of Extreme Makeover: Work Edition, we take a look inside the construction zone on the 24th floor to see just what’s been causing all that racket. After a lot of investigating (snooping) and surveying (standing in the middle of the room with my boss while we both look around, bewildered, and say, “it looks the same”), we have finally made a determination on the reason for the noise.

You see the edge of the wall on the right? Not the part in the middle/left, but the wall whose edges run along the entire right side of the picture? That wall used to join up with the wall/post to the left. Meaning, they removed the wall entirely, and then rebuilt the wall a whopping 3 feet away from where it was. Three feet. One wall. Weeks and weeks and weeks of banging and yelling and loud music and no concentration… all to move one little wall three feet.

Oy vey. Maybe I should get into the construction business instead of the one I’m in?

Advertisements

About Lindsay

I'm a Burgher who loves trying new foods and activities. I also seem to love getting myself into trouble. Basically, I'm a trainwreck waiting to happen. :)
This entry was posted in 365 Project 2014. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s